Non-Compliance detail


  
Summary
 
Licence number: 2122
Annual Return Start: 27 Jul 2005
Annual Return End: 26 Jul 2006
Date Received: 26 Sep 2006
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
M3.1 The sampling plane locations in the boiler ductwork at Liddell do not satisfy the requirements of AS4323.1 - 1995 with regard to the upstream and downstream distances from disturbances ie: water at sampling plane is turbulent Appropriate Action taken by licensee 1